The total construction area is 35,000 square meters, 280 meters long, 120 meters wide and 9.4 meters high.Design conditions: wind pressure 0.61km/m2 snow pressure 0.2km/m2 roof slope 1:20 column spacing 6m.With a span of 120 meters and 3 medium columns, 4 small spans of 30 meters are synthesized.The biggest feature of the building is the 8 m canopy surrounding the building.
Material:
Produce Line:
Specification:
Material |
Specification |
Length |
Single slope, double slope, muti slope |
Width |
Single span, double-span, Multi-span |
Height |
single floor, double floors |
Column |
Q235, Q345 welded H section steel |
Beam |
Q235, Q345 welded H section steel |
Purlin |
Q235 C channel or Z channel |
Knee brace |
Q235 angle steel |
Vertical and transversal support |
Q235 angle steel, round bar or steel pipe |
Tie bar |
Q235 steel pipe |
Brace |
Q235 round bar |
Cladding system |
EPS, PU, Fiber glass wool sandwich panels or corrugated steel sheet with fiber glass wool insulation. available in Diferent colors&gauge |
Partition wall |
sandwich panels (EPS, PU, Fiber glass wool etc.) available in Diferent colors&gauges |
Door |
sandwich panel sliding door or roller door |
Gutter |
stainless steel or color steel sheet |
Rainspout: |
PVC |
Live load on roof |
In 120kg/Sqm (Color steel panel surrounded) |
Wind resistance grade |
12 grades |
Earthquake-resistance |
8 - 9 grades |
Structure usage |
Up to 50 years |
Finishing options |
vast array of colors and textures available |
Paint Options |
Gray paint, red paint, white paint, expoxy zinc etc. Or Galvanized |
Packing&Shipping:
1.All of the steel column and beams plates and edges will be packed with blankets to protect them from the container bump during the shippment.
2.To make the loading more efficient and save some delivery cost, 40OT container is prefered for loading the steel frames.
3.All the wall and roof panels will be filmed by two sides and fixedly setted in the 40HQ container.
4.All the windows and doors will be protected with bubble rapping paper and fixedly setted in the container.