• Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
  • Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
  • Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
  • Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
  • Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
  • Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

Application: Steel Workshop, Steel Structure Platform, Structural Roofing, Frame Part
Type: H-Section Steel
Standard: GB, ASTM, DIN, JIS
Trademark: Carbon Structural Steel, Tailong
Forming: Hot-Rolled Steel
Connection Form: Bolt Connection
Customization:

Contact Supplier

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
TL-WS
Member
Steel Beam
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wallboard
Brand Name
Tailong Construction
Product Name
Steel Workshop with High Quality
Dimensions
H,C,Z Steel
Color
Blue,White,etc.
Size
as Your Request
Roof Cladding
Sandwich Panel or Corrugated Steel Sheet with Fi
Rainspout
PVC Pipe
Connecting
High Strength Bolts
Roof Gutter
Color Steel Sheet
Brace
Round Bar
Transport Package
Export Standard Packing
Specification
GB
Origin
Qingdao, Shandong
HS Code
7308900000
Production Capacity
60000 Tons Per Year

Product Description

Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

steel workshop features
Save construction cost:Cheaper price than concrete building per square meters
Entertainment protection:Can be recycled in 80%
Appearance:Excellent shape & Wonderful design
Big span:Meet the requirement of big space
Short construction period:30 days from design to assemble completely 
Anti-seismic:The seismic action of steel structure building is very well

Thermal insulation:Thermal insulation effect is very good
Ventilation:Large space , good ventilation effect
Waterprooof:Strong waterproof function
Noise isolation :effective noise isolation          
 

NO
Item Structure
1 main frame H steel beam
2 wall EPS or PU sandwich panel
3 purlin C,Z purlin
4 roof galvanized steel 
5 window plastic steel window or as your request
6 door steel sliding door
7 Ventilation No power Ventilation
8 Column & Transverse Brace Angle Steel or H Section Steel or Steel Pipe
9 Rainspout PVC Pipe
10 Packing Decided by you , loaded into 1X 40ft GP,1X20 ft GP,1X40 ft HQ

Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel

  Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel



the following question we need to know before making the price.

1
Location (where will be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much 
lower than that of the former  
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m


 
Prefabricated Steel Frame Structure/Steel Structure Steel Shed/Steel Structure Steel
 

Send your message to this supplier

*From:
*To:
avatar Mr. Ivan zeng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
83
Year of Establishment
2003-06-11