• Hot Sale Prefab Steel Structure Warehouse/Workshop
  • Hot Sale Prefab Steel Structure Warehouse/Workshop
  • Hot Sale Prefab Steel Structure Warehouse/Workshop
  • Hot Sale Prefab Steel Structure Warehouse/Workshop
  • Hot Sale Prefab Steel Structure Warehouse/Workshop
  • Hot Sale Prefab Steel Structure Warehouse/Workshop

Hot Sale Prefab Steel Structure Warehouse/Workshop

Material: Steel Structure
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification: ISO, CE
Customized: Customized
Brand Name: Tailong Construction
Original Place: Qingdao
Customization:

Contact Supplier

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
TL-WS
Dimensions
H, C, Z Steel
Size
Any Size Is Available
Crane Beam
5t, 10t, 15t
Grade
Q235/Q345
Roof and Wall Panel
EPS, PU, Rock Wool
Window
Plastic or Aluminum Steel Window
Transport Package
According to Customer′s Request
Specification
CE ISO SGS
Trademark
Qingdao TaiLong
Origin
Qingdao
HS Code
7308900000
Production Capacity
20000 Square Meters Per Month

Product Description

Hot Sale Prefab Steel Structure Warehouse/Workshop
Hot Sale Prefab Steel Structure Warehouse/Workshop
Hot Sale Prefab Steel Structure Warehouse/Workshop
Hot Sale Prefab Steel Structure Warehouse/Workshop

1. Strong steel structure frame is fastness, wind proof, snow proof, earthquake resistant.

2. Plasticity steel as steel warehouse materials is easy to design. So the warehouse is large space, light weight.

3color sandwich panel and color corrugated steel sheet as maintenance system is heat insulation, good appearance, waterproof, sound proof.

4Bolted connection steel workshop is easy to install and disassemble.

5. Cold bend steel gutter and downspout is good for drainage system.

 
   item  material
 1  steel structure  light steel
 2  floor  plywood board
 3  wall  EPS,rook wool,glass fiber,PU sandwich panel
 4  window  Aluminum window
 5  door  sandwich panel door
 6  ceiling  steel ceiling
 7  roof  EPS or PU sandwich panel
 


Advantages:

# Environment friendly: All the materials of steel warehouse is made of steel, which can be reused many times.

# Good appearance: Warehouse with color steel sheet wall panel and roof panel is beautiful and tidiness.

# Quality: Steel structure warehouses with steel structure frame and colorful steel sheet panel is very fastness.

# Good drainage system with cold bend steel sheet gutter and pvc downpipe

# Connection: All the steel materials were connected with high strength bolts, shearing bolts, bracket bolts etc is easy to install and dismantle.

# Short delivery time. All the materials load in containers, ship abroad.

# Short production time: The warehouse with flexible design was devided into a number of steel structure parts, be manufactured by skilled workers in advanced machines.

# Installation: If needed, our engineers will provide technical guidance onsite.


Why us?
The ASTC Advantage
Competitive Prices Our production capacity (approximately 300000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced software we use.
Fast Delivery
We are able to design, detail, fabricate and supply simple buildings in approximately 8 weeks. 
Most of our buildings are delivered and erected within 10weeks (this relies on various factors such as stock position, weather etc).
Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
Any problems that arise are quickly dealt with to minimise any delays. 
Safety on site is also made a priority.
Exports & International Sites
Our projects and products have been used in many countries and regions, such as: Australia, yemen, Mongolia, Angola, South Africa, India, Bangladesh, Singapore, Sudan, etc
Vast Experience
Most of our staff have been with us for over 10 years, some even 20 years.
High Quality
Our product design, the manufacture is in line with SGS or BV inspection standards, can accept the whole process of SGS or BV inspection.
We have also designed to the most stringent ISO standards successfully.
We have an in-house Quality Control department that ensures that our workmanship is of good quality.
After Sales
The Project Coordinator responsible for your job will be in constant contact with you to make sure that your entire project is executed from start to finish.
Our view is to develop a long-term relationship with our clients, many of which are already lifetime partners.
Prestige
Steel Structures Ltd is one of the most reputable, professionally run businesses in the country
 
 
the following question we need to know before making the price.
1 Location (where will be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much 
lower than that of the former  
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
10 crane needed or not If yes, _____units, max. lifting weight____tons; max. lifting height _____m


 
  Qingdao Tailong Steel Structure
http://tlsteelstructure.en.made-in-china.com 
Tel:0532-8878-0515
  
  

 

Send your message to this supplier

*From:
*To:
avatar Mr. Ivan zeng
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2013

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
83
Year of Establishment
2003-06-11