Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Brand Name: | Tailong Construction |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Workshop with High Quality
steel workshop introduction
The main steel structure:H type steel & square tube & circular tube
The second steel structure:circular tube & round steel & angel steel
Pulin:C & Z type steel
Roof and wall panel:Eps sanwich panel & color steel sheets
Bracings:Round steel
Surface painting:Painted & Hot dip galvanized
Window:Plastic - steel & Aluminum alloy window
production capacity:10000 tons per months
MOQ:500 square meters
Packing way:40 feet containers
Payment way:T/T & L/C
Delivery time:30-35 days after after recieve deposit
Delivery port :Qingdao port
steel workshop features
Save construction cost:Cheaper price than concrete building per square meters
Entertainment protection:Can be recycled in 80%
Appearance:Excellent shape & Wonderful design
Big span:Meet the requirement of big space
Short construction period:30 days from design to assemble completely
Ventilation:Large space , good ventilation effect
Waterprooof:Strong waterproof function
Noise isolation :effective noise isolation
NO | Item | Structure |
1 | main frame | H steel beam |
2 | wall | EPS or PU sandwich panel |
3 | purlin | C,Z purlin |
4 | roof | galvanized steel |
5 | window | plastic steel window or as your request |
6 | door | steel sliding door |
The photos of steel materials :
Why us?
The ASTC Advantage
Competitive Prices Our production capacity (approximately 300000 metric tons annually) together with effective and economic engineering and manufacturing methods enable us to offer the most competitive prices in the industry.
Fast Quotations
Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced software we use.
Fast Delivery
We are able to design, detail, fabricate and supply simple buildings in approximately 8 weeks.
Most of our buildings are delivered and erected within 10weeks (this relies on various factors such as stock position, weather etc).
Site Supervision
A site supervisor is always present at site to ensure that work is being carried out satisfactorily.
Any problems that arise are quickly dealt with to minimise any delays.
Safety on site is also made a priority.
Exports & International Sites
Our projects and products have been used in many countries and regions, such as: Australia, yemen, Mongolia, Angola, South Africa, India, Bangladesh, Singapore, Sudan, etc
Vast Experience
Most of our staff have been with us for over 10 years, some even 20 years.
High Quality
Our product design, the manufacture is in line with SGS or BV inspection standards, can accept the whole process of SGS or BV inspection.
We have also designed to the most stringent ISO standards successfully.
We have an in-house Quality Control department that ensures that our workmanship is of good quality.
After Sales
The Project Coordinator responsible for your job will be in constant contact with you to make sure that your entire project is executed from start to finish.
Our view is to develop a long-term relationship with our clients, many of which are already lifetime partners.
Prestige
Steel Structures Ltd is one of the most reputable, professionally run businesses in the country
the following question we need to know before making the price.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Qingdao Tailong Steel Structure
http://tlsteelstructure.en.made-in-china.com
Tel:0532-8878-0515