Customization: | Available |
---|---|
Type: | H-Section Steel |
Window: | PVC or Alluminum Alloy |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Low Cost Large-Span Prefabricated Light Steel Structure Warehouse Building Construction
Low Cost Large-Span Prefabricated Light Steel Structure Warehouse Building Construction including designing, fabrication, and erection with high quality and safety control. And there are many characteristics as follows:
1. Enviromental friendly
2. Lower cost and maintenance
3. Long using time up to 50 years
4. Stable and earthquake resistance up to 9 grade
5. Fast construction, time saving and labor saving
6. Good appearance
Items |
Specification |
|
Main Steel Frame |
Column |
Q235, Q345 Welded H Section Steel |
Beam |
Q235, Q345 Welded H Section Steel |
|
Secondary Frame |
Purlin |
Q235 C and Z purlin |
Knee brace |
Q235 Angle Steel |
|
Tie rod |
Q235 Circular Steel Pipe |
|
Brace |
Q235 Round Bar |
|
Vertical&Horizontal support |
Q235 Angle Steel, Round Bar or Steel Pipe |
|
Cladding system |
Roof panel |
EPS Sandwich Panel / Glass Fiber Sandwich Panel / |
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
||
Wall panel |
same with roof panel |
|
Accessories |
Window |
Aluminium Alloy Window / PVC Window |
Door |
Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door |
|
Rainspout |
PVC |
|
Live load on Roof |
In 50kg/Sqm (Color steel panel surrounded) |
|
Wind Resistance Grade |
according to local climate |
|
Earthquake-resistance |
8 Grades |
|
Structure Usage |
Up to 50 years |
|
Finishing Options |
Vast array of colors and type available |
|
Paint Options |
Alkyd painting, two primary painting, two finish painting |
|
(gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
Our Service:
1. Professional design and engineering team
Full solution for house design. We could make the design for whole house as per your requirement.
2. Procurement and Manufacture for all material for prefabricated building
We have a professional procurement team to make sure all the materials are with good quality. And our factory operation under ISO standard, to make sure the fabrication works with high technology.
3. Site management & Installation supervision
We could send our engineers to help for the installation supervision, you just need to prepare a team which know normal construction works will be OK.
1 | Location (where will be built?) | _____country, area |
2 | Size: length*width*height | _____mm*_____mm*_____mm |
3 | wind load (max. wind speed) | _____kn/m2, _____km/h, _____m/s |
4 | snow load (max. snow height) | _____kn/m2, _____mm |
5 | anti-earthquake | _____level |
6 | brickwall needed or not | If yes, 1.2m high or 1.5m high |
7 | thermal insulation | If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former |
8 | door quantity & size | _____units, _____(width)mm*_____(height)mm |
9 | window quanity & size | _____units, _____(width)mm*_____(height)mm |
10 | crane needed or not | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |