Prefabricated Multi-Layer Light Steel Structure Frame Modern Warehouse for Factory
1.Our Factory:
Project Detailed:
Production Description:
The total construction area is 35,000 square meters, 280 meters long, 120 meters wide and 9.4 meters high.Design conditions: wind pressure 0.61km/m2 snow pressure 0.2km/m2 roof slope 1:20 column spacing 6m.With a span of 120 meters and 3 medium columns, 4 small spans of 30 meters are synthesized.The biggest feature of the building is the 8 m canopy surrounding the building.
Material:
Produce Line:
Specification:
Prefabricated Multi-Layer Light Steel Structure Frame Modern Warehouse for Factory |
main steel frame
|
steel column,girder,wind-resistance,roof purlin and wall purlin,steel roof gutter,crane beam
|
secondary steel frame
|
horizonta support,pillar support,brace,tie rod,roof panel and wall panel,corner support,standard parts and accessories
|
Steel Column
|
H-beam
|
Purlin
|
C type or Z type
|
Window
|
aluminium window or Model steel push-pull window
|
Door
|
slidding door or rolling door
|
Material
|
Q235B&Q345B Steel
|
Rainspout
|
Pvc Pipe
|
Surface
|
Two layer of Anti-Rust paniting
|
Column and Beam
|
Welded H-Section and Hot Rolled I-Section
|
Packing&Shipping:
1.All of the steel column and beams plates and edges will be packed with blankets to protect them from the container bump during the shippment.
2.To make the loading more efficient and save some delivery cost, 40OT container is prefered for loading the steel frames.
3.All the wall and roof panels will be filmed by two sides and fixedly setted in the 40HQ container.
4.All the windows and doors will be protected with bubble rapping paper and fixedly setted in the container.
FAQ:
1)Is your company a factory or trade company?
We are factory, so you can get the best price and competitive price.
2)What's the quality assurance you provided and how do you control quality ?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc.
3) Do you offer guiding installation on site overseas for warehouse building?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to supervise installation on site overseas. They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algeria, and Ghana.
4) What is your main market?
Guided by global field of vision, our products have been exported to many countries and regions with its good quality and good service, such as France, UAE, South East Asia, Africa and so on. We will be glad to establish sincere business cooperation with you in the near future.
5) How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
If you are interested in our product,Please contact us: