Prefabricated Prefab Houses Modular House

Product Details
Customization: Available
Brand Name: Tailong Construction
Original Place: Qingdao
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
83
Year of Establishment
2003-06-11
  • Prefabricated Prefab Houses Modular House
  • Prefabricated Prefab Houses Modular House
  • Prefabricated Prefab Houses Modular House
  • Prefabricated Prefab Houses Modular House
  • Prefabricated Prefab Houses Modular House
  • Prefabricated Prefab Houses Modular House
Find Similar Products

Basic Info.

Model NO.
TL
Dimensions
H, C, Z Steel
Size
Any Size Is Available
Crane Beam
5t, 10t, 15t
Grade
Q235/Q345
Roof and Wall Panel
EPS, PU, Rock Wool, EPS or PU Sandwich Panel
Window
Plastic or Aluminum Steel Window
Main Structure
Light Steel
Material
Sandwich Panel
Usage
Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification
ISO, CE
Customized
Customized
Transport Package
Flat Package Into Containers
Specification
CE ISO SGS
Trademark
Qingdao TaiLong
Origin
Qingdao
HS Code
9406000090
Production Capacity
20000 Square Meters Per Month

Product Description

Prefabricated Prefab Houses Modular HousePrefabricated Prefab Houses Modular House

Prefabricated Prefab Houses Modular House
Prefabricated Prefab Houses Modular House

features:
1, light steel structure, strong and durable
2, Beautiful outlook,unique and flexible design
3, Economical,money saving
4, Heat-insulation, water proof, fire-resistance.
5, All components be prefabricated, no pollution during construction
6, Concrete foundation
7, Termite proof 
8, A 40HC container can hold 150-200sqm.
9,Quick installation,time-saving,8 skilled workers can finish installation of 150sqm in 4 days.

 

The detail information is as follows:
No. Sort Name Specification
1 Specification length No limited
2 Width Less than 11m
3 Wall height 2600mm/2800mm
4 Clear height 2600mm/2800mm
5 Roof slope 15°
6 Standard accessory Wall board 75mm thickness double color-steel sandwich panel with polystyrene foam inside. Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.546w/ m².k.
7 False ceiling 75mm thickness double color-steel sandwich panel with polystyrene foam inside. Heat Insulated coefficient is 0.041w/m.k. Heat transfer coefficient is 0.546w/ m².k.
8 Roof board color steel corrugated sheet, 0.5mm thickness
9 Outside door Security door, single door with dimensions of 900*2100mm, furnished with a handle lock with 3keys. Doorframe is made of 1.2mm steel, and door is made of 0.7 mm steel, 90mm thick rock wool insulation foam.
10 Inside door SIP, single door with dimensions of 750*2000mm, furnished with a cylinder lock with 3keys. Doorframe is made of aluminum, 50mm thick EPS insulation foam.
11 Window(W-1) PVC, white color, with dimensions of 1200*1200mm, glazed with glass in a thickness of 5mm, two bay fixed, and two bay sliding, supplied with fly screen.
12 Window(W-2) PVC, white color, with dimensions 500*500mm, glazed with glass in a thickness of 5mm, casement opening, supplied with fly screen.
13 Channel Galvanized Steel Plain Sheet press moulding Material: Q235. Painted
14 Post Square steel tube Material: Q235. Painted
15 Purline Square steel tube Material: Q235. Painted
16 Roof truss Square steel tube Material: Q235. Painted
17 Decoration and connection color steel sheet, 0.35mm thickness
18 Option Decorative floor PVC, laminated or ceramic tile
19 Drainage system Provided plan, design and construction
20 Electric system Provided plan, design and construction
21 Technical parameter Bearing load 30kg/m2
22 Wind pressure: 0.45KN/M2
23 Fire proof B2 grade
24 Resistant temperature -20 ºC to 50ºC


Why Choose Prefabricated house for Site Camp Solution? 
There are many advantages to modular camp construction for site camps including:
 
 1. Speed of construction and camp installation Allows for the building and the site work to be completed simultaneously, reducing the overall completion schedule, all the Main Structures will be connect with bolts, no welding works. All the wall and roof structure, flooring will be fixed by Self-tapping Screw or nails, normal Carpenter team could make a good job!
  
2. Economical Solution, compare to concrete building, prefabricated building will be much more Economical
 
 3. Ability to service remote locations Assembling a work camp close to the work site reduces travel time which reduces cost.
 
 4. Long time span Well-built modular worker camps can last for 10, 15 or 20 years or more.
 
 5.Safe and stable, Earthquake resistance: Grade 7, Wind resistance: Grade 11(wind speed≤ 120km/h)
 
 
the following question we need to know before making the price.
1 Location (where will be built?) _____country, area
2 Size: length*width*height _____mm*_____mm*_____mm
3 wind load (max. wind speed) _____kn/m2, _____km/h, _____m/s
4 snow load (max. snow height) _____kn/m2, _____mm
5 anti-earthquake _____level
6 brickwall needed or not If yes, 1.2m high or 1.5m high
7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; . if not, the metal steel sheets will be ok. The cost of the latter will be much 
lower than that of the former  
8 door quantity & size _____units, _____(width)mm*_____(height)mm
9 window quanity & size _____units, _____(width)mm*_____(height)mm
   
 
 

Welcome to contact me
Qingdao Tailong Steel Structure
http://tlsteelstructure.en.made-in-china.com 
 
  
  



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier